Lake Tahoe Road Construction Calendar
  • Tahoe.com Staff, 2:08pm, 6/13/2012

    Some like to say that this region’s official flower is the road cone. The truth is, no matter where you travel it can be hard to avoid summer road construction. Here’s a handy calendar of road work in and around the Lake Tahoe region. If you’re looking for some alternate transportation to avoid the road cones read Bikes, Boats, Trolleys and Cars: Getting Around Lake Tahoe.

    U.S. Interstate 80

    U.S. 80 near Emigrant Gap
    What: Lane replacement
    When: May-Oct. 2012
    Up to 30 minute delay

    U.S. 80 Donner Summit to west of Donner Park
    What: Lane replacement
    When: May-Oct. 2012
    Up to 30 minute delay

    California State Route 89

    SR 89 between Truckee and Tahoe City
    What: Pavement rehabilitation
    When: May-Oct. 2012
    Up to 20 minute delay

    SR 89 Tahoma to Tahoe City
    What: Water quality improvements and some paving
    When: May-Oct. 2012-2015
    Up to 10 minute delay

    California State Route 267

    SR 267 near Northstar Drive to near Brockway Summit
    What: Slope stabilization and shoulder paving
    When: May-Oct. 2012
    Up to 30 minute delay

    U.S. Highway 50

    U.S. 50 from Zephyr Cove to Glenbrook
    What: Drop inlet modification
    When: May-Oct. 2012
    Up to 10 minute delay

    U.S. 50 from Trout Creek Bridge to Ski Run Boulevard
    What: Water quality improvements, roadway widening and paving
    When: May-Oct. 2012-2013
    Up to 10 minute delay

    U.S. 50 Cave Rock to Spooner Summit
    What: Slope stability and erosion control improvements
    When: May-Oct. 2012
    Up to 30 minute delay

    Nevada State Route 431

    Where: SR 431 from SR 28 to Mount Rose Summit
    What: Water quality improvements
    When: May-Oct. 2012
    Up to 10 minute delay

    Nevada State Route 28

    Where: SR 28 from SR 431 to North Shore Stateline
    What: Water quality and erosion control improvements
    When: May-Jun. and Sept.-Oct. 2012
    Up to 30 minute delay

    Where: SR 28 at SR 431
    What: Construct roundabout
    When: May-Oct. 2012
    Up to 30 minute delay

    Where: SR 28 from Incline Village to Sand Harbor
    What: Drop inlet modifications
    When: May-Oct. 2012
    Up to 10 minute delay

    source: www.tahoeroads.com

    -and-

    Click the image to read more from Tahoe Magazine Summer 2012

    Image: Creative Commons Attribution (2.0) image from gotgenes‘s Flickr photostream

  • Comments


Tahoe Action e-News